Projects
Agar Drive Truganina
Duration
12 days
Area
7357 sqm
Panels
400
Required 400 panels Totalling 7357 m2, on average we erected 25 to 30 panels per day and was completed in 12 days
GET IN TOUCH
2 Tube St, Sunshine North VIC 3020